The Streets and Building Division maintains 44.5 miles of paved road rights-of-way, as well as sidewalks, boardwalks and bicycle paths throughout the city while maintaining 53 city-owned structures.
The Fleet Maintenance Division maintains all city vehicles and small equipment.
Sidewalk Repair Program
The Streets, Buildings, and Fleet Maintenance Division placed major emphasis on developing a comprehensive sidewalk repair program. A plan of action was implemented which included the conversion of a step van to a permanent sidewalk repair vehicle complete with a three-man repair team on duty. A sidewalk rating condition similar to the Pavement Rating Condition (PCR) already in place for street maintenance has been implemented.